A division of Battlers Connection

Rotorworkz

Carbon Fiber

eCCPM Frame

for the Quick of Japan EP-8

EP-8 SE

(Special Edition)

Introduction

Thank you for purchasing the new Rotorworkz carbon fiber eCCPM frame for the Quick of Japan EP-8 RC helicopter. We are sure you will be quite pleased with the performance results achieved after installing this frame modification. As well, you will begin to rely on the durability this frame possesses, further enhancing your flight enjoyment.

Before you begin assembling your frame kit, there are a few considerations you must make. First, there are several positions in which to mount each of your radio and power components, and proper layout will ensure success. Always try to keep your power components as far away from the radio components as possible. Be sure to use a high quality antenna, mounted well away from the carbon fiber airframe.

You must also consider the center of gravity once the completed helicopter is ready to fly. Component placement can alter the center of gravity, negatively affecting flight performance and stability.

Once you have a plan in mind, you can begin gathering the required tools and supplies. Below is a list of everything necessary to complete your helicopter:

Tools

  • #1 & #2 Philips head screw driver (For Stock hardware)
  • 2 mm Hex Wrench or Driver
  • 2.5mm Hex Wrench or Driver
  • 5.5mm wrench
  • Ruler or calipers in metric scale

Supplies

  • Medium grade LocTite Retaining Compound
  • Plastic wire “Zip” ties

Quick Parts

  • Complete main rotor assembly, including main shaft and lock collar
  • Complete Tail section, including boom, mounts, belt and Tail rotor assembly
  • Main drive gear assembly and motor mount
  • Tail drive gear assembly
  • (1) 28 mm threaded spacers
  • Front cross-brace/canopy retainer
  • (2) Canopy pins
  • All servo to Swash linkages
  • Screw hardware

 Additional Parts (not included in kit)

  • (1) Approximate 20 mm Linkage Rod
  • (1) Approximate 30 mm Linkage Rod
  • (4) Plastic Ball links
  • (4) Metal linkage balls
  • (4) Linkage ball retaining screws

Power Components

  • Brushless Motor
  • Brushless Speed Control (ESC)
  • BEC circuit (unless integrated in ESC)
  • 3, 4, 5, or 6S and up Lithium Polymer Battery(s)

Radio Components

  • Minimum 5 channel Computer Transmitter capable of providing 120˚ CCPM Mixing
  • 5 or 6 Channel (minimum) receiver
  • (3) Hitec HS-85MG or Similar Servos with arms with 17 and 20 mm hole spacing
  • (1) Gyro and Servo combination (Example: Futaba GY401 Gyro and 9254 Servo)

Parts included with this kit

Depending on kit you chose composite panel parts are cut from either Carbon Fiber or G-10 sheet material

  • (1) Right frame side panel
  • (1) Left frame side panel with Tail Rotor Servo mount
  • (1) Drive gear cover panel
  • (1) ESC tray
  • (1) Gyro tray
  • (2) Landing Skid panels
  • (2) Doubler panels
  • (2) Support braces
  • (3) M3 x 30 mm Aluminum threaded spacer
  • (2) Aluminum shoulder spacers
  • (2) Delrin 90 degrees bell cranks with bearings will ball spacing from center at 17 and 20 mm
  • (2) Delrin Landing Gear Mounts
  • (4) Nylon spacers
  • (8) M3 x 8 mm screws
  • (4) M3 x 14 mm screws
  • (8) M3 x 10 mm screws
  • (2) M3 x 18 mm screws
  • (4) M2.5 x 8 mm screws
  • (2) M3 Nuts


Install 90 degree bell cranks

  • Locate the right and left Frame panels.
  • Locate the (2) 90 Degree Bell cranks, (2) Aluminum shoulder spacers (2) M3 x 18 mm Screws (2) M3 Nuts.
  • Install  M3 x 18 mm screw through inner race of bell crank bearing so that the head of the screw is touching the bearing
  • Install Aluminum shoulder spacer with reduced section facing bell crank allow it to pass through delrin bearing shoulder and make contact with bearing race.
  • Repeat for second bell crank assembly.
  • Use picture (top left) indicated by red circle to properly install (1) bell crank insert the M3 x18mm retaining screw and M3 lock nut in the correct side of panel as shown in top left
  • Repeat install of second bell crank in right panel as pictured (bottom center)
  • Note: Only tighten enough to remove slop in screw to prevent bearing from binding in bell cranks.


Install Stock Quick Parts

  • Install stock main shaft bearing mounts Tail rotor drive gear assembly, boom mounts and canopy pin in proper locations using stock Quick hardware with exception of adding to bottom main shaft bearing.
  • Install canopy pin on right side frame in same location as stock frame(4th hole from front)
  • Install frame doubler first on left side frame bottom main shaft bearing note orientation pictured (bottom center) using provided M2.5 x 8 mm screws.
  • Assemble both left and right side frames and insert Gyro tray pictured (top right) with tabs on tray inserting into slots on frame panels Note: Leave screws loose.
  • Repeat install frame doubler for right frame panel again pictured  (bottom center)

Note: slot and tab parts will have a snug fit this is to help prevent vibration in part or unwanted movement


Installing Drive Gear Cover

  • Locate Drive gear cover and note larger hole pictured (top left).
  • Install Cover into frame panels with tabs on cover into slots on frame panels Note Big hole on cover should be orientated directly inline with main shaft bearings pictured (top right)
  • Install (1) provided 30 mm Aluminum threaded spacer directly below motor mount area using provided 8 mm screws pictured (bottom left)

Note: slot and tab parts will have a snug fit this is to help prevent vibration in part or unwanted movement


Landing Gear Assembly and Install

  • Locate (2) Delrin Landing Gear mounts and (2) Landing Skids assemble Landing gear with provided M3 x 8 mm screws pictured (top left)
  • Locate (2) Quick Stock aluminum angle parts and (1) Stock 28 mm Aluminum threaded spacer
  • Mount landing gear assembly using provided M3 x 8 mm screws
  • Mount Stock aluminum spacer using stock hardware in area just in front of landing gear pictured bottom center.

Installing ESC Tray and Frame Supports

  • Locate (1)CF or G-10 ESC Tray, (2) 30 mm Aluminum threaded frame spacer, (4) Nylon plastic spacers, (2)CF or G-10 Frame supports, and one stock Front cross-brace/canopy retainer pictured (top left)
  • Install ESC Tray tabs into frame slots pictured (bottom center) (1) provided 30 mm Aluminum threaded frame spacer and (2) M3 x 8 mm screws just under the forward slot for ESC tray.
  • Install both CF or G-10 Frame supports with (1) Provided 30 mm Aluminum threaded spacer, (4) nylon plastic spacers, using provided (4) M3 x 14 mm screws Note Orientation on frame supports the pointed corner as pictured (top right) points down and back Note: bottom frame support screws attach to your stock Front cross-brace/canopy retainer

Note: slot and tab parts will have a snug fit this is to help prevent vibration in part or unwanted movement


You now have completed basic assembly of your EP-8 SE Kit


Servo Linkage Rod and Swash estimated lengths

Distance is an estimate using stock main shaft measured between linkage centers @ 20 mm hole spacing on Bell cranks

  • Right frame side Servo to bell crank marked in Green 55 mm
  • Right Frame side Bell crank to Swash marked in Red 55 mm
  • Left Frame side Servo to Bell crank marked in Orange 33 mm
  • Left Frame Side Bell crank to Swash marked in Blue 65 mm

 


Keep Wires away from rotating items use Wire ties Tape, Velcro, etc...

Don’t Forget to add your Tail Fin

Enjoy